Saturday, 14 December 2019

JIG SWITCHING SOURCE CARDS LG. JIG ASSEMBLY FOR SOURCE TEST (ON AND OFF SYMPTOM).

JIG Switching Source Cards LG. Jig assembly for Source test (ON and OFF symptom).
How to assemble the Jig cable to switch on the source boards. Using a source cable.   Follow the steps below.
1. Using a power cord
2. Separate only the pins necessary to switch the power supply.
3. Always check the source plate for the switching pins.
4. Necessary pins for the switching (PWR_ON + 3,5V + DVR_ON).
5. After this separation cut the wires to 6 cm length and put short the wires and insulate with electrical tape.
6. Put the Jig cable in the source and check if the source will turn on.
7. Table of pins required for family switching.